This project is located in North Carolina, USA, including installation of switchgear, CT cabinets, transformers, and busway systems, all carried out under NEC and NFPA compliance.
Equipment Foundation & Busway Installation
Excavation works were carried out outside the facility to install underground conduits connecting the transformer to indoor low-voltage distribution panels, ensuring reliable and compliant electrical power delivery.
Indoor Electrical Installation
Integration of cable trays, conduits, and switchgear enclosures ensures a clean and safe electrical environment.
CT Metering Cabinet & Safety Disconnect Installation
Installed CT metering cabinets and safety disconnect switches within the existing facility to increase capacity and provide reliable isolation for new equipment loads.
Low-Voltage Switchboard & UPS Installation
Installed low-voltage switchboards and UPS systems to deliver stable power and backup capacity for critical equipment and new production loads.
Final Completion Overview
The project was completed under continuous coordination with production teams, achieving efficient and compliant operation readiness.